Installation and construction method of solar street light

Go down  Message [Page 1 of 1]

Admin


Admin

<p><a href="alltopgroup.com" rel="noopener noreferrer" target="_blank">Solar street light</a> accessories:</p><p><br></p><p>Solar panel, LED lamp head (integrated controller and lithium battery), head holder, street light pole, ground cage, screws.</p><p><br></p><p>Installation steps of Xinya Solar Street Light:</p><p><br></p><p>I. pouring foundation</p><p>&nbsp;</p><p><br></p><p>1. Establish the installation location of street lights: According to the construction drawings and the geological conditions of the survey site, where there is no shading on the top of the street lights, determine the installation location of the street lights based on the distance between the street lights 20-60 meters, adjust the installation location of the street lights appropriately.</p><p><br></p><p>2. Excavation of street lamp foundation pit: at the determined street lamp installation position, excavate the street lamp foundation pit according to the height and width of the ground cage. The foundation pit should be slightly wider than the width of the ground cage. If the surface soil is soft, the excavation depth should be deepened, and other facilities (such as cables and pipelines) at the excavation location should be confirmed and protected.</p><p><br></p><p><br></p><p>&nbsp;</p><p><br></p><p>3. Pouring the streetlight foundation ground cage: In the excavated foundation pit, place the ground cage into the pit, and keep the screw of the ground cage exposed to the ground level. Then the embedded parts are poured and fixed with concrete. During the pouring process, it is constantly stirred and uniform to ensure the compactness and firmness of the entire embedded part. As shown below:</p><p><br></p><p>&nbsp;</p><p>4. Clean up the residue on the positioning board in time, wait for the concrete to completely solidify (about 7-10 days, 4-5 days if the weather is good), and then install the solar street light.</p><p><br></p><p><br></p><p>Installation of solar street light components</p><p><br></p><p>Street light installation site</p><p><br></p><p>1. Pass the wire of the LED lamp head from the center of the top of the lamp pole arm and out of the top of the lamp pole, and then fix the LED lamp head to the lamp pole arm with screws.</p><p><br></p><p>2. Fix the solar panel on the head bracket with screws. After adjusting the light angle, fix the head bracket with screws on the top of the pole.</p><p><br></p><p>3. Connect the wires of the LED lamp head to the positive and negative wires of the solar panel.</p><p><br></p><p>At this point, the installation of solar street light components is complete.</p><p><br></p><p>3. Install solar street lights on the ground base cage</p><p><br></p><p>1. Clean up the residue on the foundation</p><p><br></p><p>2. Heli stands up the solar street light and aligns the flange with the screw of the ground cage. If possible, it is recommended to use a crane as much as possible. Fix the street light to the screw of the ground cage with screws</p>

https://weyes123.666forum.com

Back to top  Message [Page 1 of 1]

Permissions in this forum:
You cannot reply to topics in this forum